top of page
St Bernard’s Ealing Hospital, West London
This Higgins Construction project spanned over 5.6 acres of surplus land to the south side of the hospital. The land was replaced with 270 new-build homes over five blocks up to nine storey's high and also included a small retail unit.
Our scope of works included: Knauf SFS Installation with Sheathing board & Insulation, Metal Stud Partition Systems & Wall Linings, Suspended Plasterboard & Acoustic Ceiling Systems with a Plastered finish and Insulated Sand & Cement Screed.
The overall cost of the project totaled £46 million and was completed in August 2018.
St Bernard’s Ealing Hospital, West London: About
bottom of page