top of page

Lincolns Inn, Central London

We feel privileged to have been part of the single biggest project to take place at The Honorable Society of Lincolns Inn since it's original construction in 1422.


The restoration project on the Grade II listed Great Hall, Library and the 13,000 Sqft double extension was in fact opened by Her Majesty The Queen in December 2018. This Graham Construction project was the second time within a year that The Queen opened one of our projects with the first being The Royal Academy of Arts.

Our Scope of works included: EOS-Etex Group SFS Installation, British Gypsum Metal Stud Partition Systems & Wall Linings, Suspended Plasterboard Ceiling Systems with a Plastered finish.

The overall cost of the project totaled £20 million.

Lincolns Inn, Central London: About
bottom of page