tlott-ltd-logo

Contact us

01727 846 850
01727 846 355
@TLottLtd
admin@tlottltd.co.uk

Orion Primary School - Kier Group

A Kier Construction Project in Edgware, T Lott Ltd completed the following works on this two storey large floor area building.

Partitioning

Drylining and acoustic partitioning works to all classrooms, double height hall spaces, staircases and communal facilities along with high quality plastering finishing works.

Lay in Grid Ceiling

T Lott supplied and Installed all lay in grid accessible ceilings on this contract which were mainly sited within the common areas and communal access rooms.

Acoustic Wall Panels and Rafts

With an acoustic design requirement on this project, we installed a number of acoustic ceiling rafts throughout.

There was also a requirement for fabric covered and framed acoustic panels within the main and small halls.

Floor Screeding

Works carried out included heavy duty floor screed and insulation to the ground floor area approx. 2500m2 including proprietary movement joints as designed in to the main building construction.